Table of Contents |
|
Document |
Filing Date |
Document Title |
Pages |
Photo |
|
155054 | Feb 02, 2002 | NTSB Track Group Chairman's Factual Report |
15 | |
155055 | Feb 02, 2002 | NTSB reports of Interview |
9 | |
155056 | Feb 02, 2002 | Post Accident Track Geometry Measurements |
2 | |
155057 | Feb 02, 2002 | Chain of Custody for Evidence Rail |
2 | |
155058 | Feb 02, 2002 | Track Profile between MP 415.0 and MP 425.0 |
3 | |
155059 | Feb 02, 2002 | Report of 1999 Traffic Density |
2 | |
155060 | Feb 02, 2002 | BNSF Rail Testing Risk Factors for Determining Frequency of Inspections |
3 | |
155061 | Feb 02, 2002 | BNSF Report of Detector Car Inspection Dates for MP 419.8 |
2 | |
155062 | Feb 02, 2002 | BNSF Report of Recorded Rail Defects between MP 419.5 and MP 420.0 |
5 | |
155063 | Feb 02, 2002 | BNSF Engineering Instructions for Removing Rail Defects from Track |
13 | |
155064 | Feb 02, 2002 | Track Geometry Vehicle Inspection Report |
2 | |
155065 | Feb 02, 2002 | Laser Measurement of Railhead Wear |
3 | |
155066 | Feb 02, 2002 | Amtrak Head-End Track Quality Inspection Report |
2 | |
155067 | Feb 02, 2002 | U.S. Department of Transportation Pre- Accident Inspection Reports |
11 | |
155068 | Feb 02, 2002 | List of BNSF Qualified Track Inspectors |
5 | |
155069 | Feb 02, 2002 | BNSF Track Inspection Reports from January 2, 2001 thru March 17, 2001 |
68 | |
155070 | Feb 02, 2002 | U.S. Department of Transportation Post-accident Inspection Reports |
4 | |
155071 | Feb 02, 2002 | FRA Database Data for Track Caused Derailments on All Types of Track |
2 | |
155072 | Feb 02, 2002 | FRA Database Data for Track Caused Derailments on Main Line Track |
2 | |
155073 | Feb 02, 2002 | Photographs |
1 | |
155074 | Feb 02, 2002 | Photo 1. Viewing eastward toward the POD, from station #4 west of the POD |
| 1 |
155075 | Feb 02, 2002 | Photo 2. View of the POD, and the East end rail segment of the 14 foot 11 1/2 "plug" rail |
| 1 |
155076 | Feb 02, 2002 | Photo 3. View of the rail end at the POD being pulled out for a closer inspection |
| 1 |
155077 | Feb 02, 2002 | Photo 4. End view of the East end rail segment at the POD and the internal rail defect that measured 24 1/2 inches from the East end bolted rail joint |
| 1 |
155078 | Feb 02, 2002 | Photo 5. Rail end view of the matching rail face from the POD, and middle segment of the 14 foot 11 1/2 inch "plug" rail |
| 1 |
155079 | Feb 02, 2002 | Photo 6. End View of the second internal defect that measured 98 1/2 inches from the East end bolted rail joint |
| 1 |
155080 | Feb 02, 2002 | Photo 7. View of the West end segment of the 14 foot 11 1/2 inches "plug" rail |
| 1 |
155081 | Feb 02, 2002 | Photo 8. End view of the matching rail face for the second internal defect that measured 98 1/2 inches from the East end bolted rail joint |
| 1 |
155082 | Feb 02, 2002 | NTSB Materials Laboratory Factual Report |
12 | |
155083 | Feb 02, 2002 | NTSB Track Group Accident Addendum Report |
5 | |
155084 | Feb 02, 2002 | BNSF Engineering Instructions, Revision Date May 15, 2001 |
8 | |
155085 | Feb 02, 2002 | Code of Federal Regulations, Track Safety Standards, Title 49 Part 213.237 |
3 | |
155086 | Feb 06, 2002 | Operations Factual Report |
6 | |
155087 | Feb 02, 2002 | Crew Interviews |
124 | |
155088 | Feb 02, 2002 | Train Consist |
7 | |
155089 | Feb 02, 2002 | Train and Operations Information |
7 | |
155090 | Feb 02, 2002 | Train Bulletins and Orders |
30 | |
155091 | Feb 02, 2002 | Timetable |
41 | |
155092 | Feb 02, 2002 | Efficiency Testing Records |
19 | |
155093 | Feb 02, 2002 | Employee Information |
52 | |
155094 | Feb 02, 2002 | Event Recorder |
4 | |
155095 | Feb 02, 2002 | Accident Report |
10 | |
155096 | Feb 02, 2002 | NTSB Signal Group Chairman's Factual Report |
7 | |
155097 | Feb 02, 2002 | BNSF, Control Center - Data Logs |
21 | |
155098 | Feb 02, 2002 | BNSF, Nebraska Division Timetable No. 3 (pertinent pages) |
6 | |
155099 | Feb 02, 2002 | BNSF, Hot Box Detector (MP 398.9) - Data |
5 | |
155100 | Feb 02, 2002 | BNSF, Dragging Equipment Detector (MP 415.6) - Data |
4 | |
155101 | Feb 02, 2002 | BNSF, CP 412.0 Wayside Signal Log |
26 | |
155102 | Feb 02, 2002 | BNSF, MP 417.1 Wayside signal Log |
21 | |
155103 | Feb 02, 2002 | BNSF, MP 419.7 Wayside Signal Log |
32 | |
155104 | Feb 02, 2002 | BNSF, CP 422.0 Wayside Signal Log |
22 | |
155105 | Feb 02, 2002 | BNSF, Signal Trouble Tickets |
8 | |
155106 | Feb 02, 2002 | BNSF, Signal Test, Inspection & Maintenance |
7 | |
155107 | Feb 02, 2002 | NTSB, Factual Report Party Sign-off Letters |
4 | |
155108 | Feb 02, 2002 | NTSB Event Recorder Title Page |
1 | |
155109 | Feb 02, 2002 | NTSB Event Recorder Group Chairman's Factual Report |
3 | |
155110 | Feb 02, 2002 | Attachment I - Graphical and Tabular Data |
44 | |
155111 | Feb 02, 2002 | Attachment II - Recorded Parameters |
2 | |
155112 | Feb 02, 2002 | NTSB Mechanical Title Page |
1 | |
155113 | Feb 02, 2002 | NTSB Mechanical Group Chairman's Factual Report |
4 | |
155114 | Feb 03, 2002 | NTSB Survival Factors Title Page |
1 | |
155115 | Feb 03, 2002 | NTSB Survial Factors Group Chairman's Factual Report |
10 | |
155116 | Feb 03, 2002 | On-Board Service Crew List & Statements |
17 | |
155117 | Feb 03, 2002 | Amtrak Consist, Site Sketch & Equipment Documents |
28 | |
155118 | Feb 03, 2002 | BNSF Incident Report |
18 | |
155119 | Feb 03, 2002 | Emergency Response Information |
12 | |
155120 | Feb 03, 2002 | Passenger Questionnaires |
221 | |
|